Chank's Tank!
Posted: Fri Mar 25, 2011 12:47 am
Figured I should go ahead and start the build log now that I'm getting parts. I've been surprised how fast things have been shipping. Ordered Misumi on 3/14 received it on 3/16. Ordered the tube from love-happyshopping on 3/19 and received it 3/23. Parts from bdring should be here sometime in April.
Looks like love-happyshopping has upgraded shipping. Around 1 ft in diameter and 3.75 ft long.
Looks like love-happyshopping has upgraded shipping. Around 1 ft in diameter and 3.75 ft long.