The GREEN MACHINE

Post your build logs here

Z axis

Postby artwood_decor » Fri Jan 11, 2013 6:48 pm

I have moved the Z axis motor to the bottom left side of the machine.
Attachments
IMG_0055.jpg
Tension the Z axis belt
IMG_0054.jpg
artwood_decor
 
Posts: 69
Joined: Thu Nov 04, 2010 8:29 pm
Location: Ontario, Canada

Gas springs added to the door

Postby artwood_decor » Sat Feb 23, 2013 11:53 pm

Purchased two 30N gas springs off e-bay and installed them.
I had to make an "L" shape bracket to offset one support and allow the door frame to get in place.
One is more than enough but I installed 2 for balance.
The spherical heads allow for reasonable angle, which was an advantage.
Attachments
Gas spring 003.jpg
Door closed
Gas spring 002.jpg
Door open
artwood_decor
 
Posts: 69
Joined: Thu Nov 04, 2010 8:29 pm
Location: Ontario, Canada

Re: The GREEN MACHINE

Postby j@son » Wed Mar 06, 2013 4:57 am

would you mind posting the listing for the gas springs you got?
j@son
 
Posts: 8
Joined: Sat Nov 24, 2012 8:22 pm

Re: The GREEN MACHINE

Postby artwood_decor » Wed Mar 06, 2013 2:08 pm

artwood_decor
 
Posts: 69
Joined: Thu Nov 04, 2010 8:29 pm
Location: Ontario, Canada

Re: The GREEN MACHINE

Postby bdring » Wed Mar 06, 2013 2:22 pm

Those springs look perfect.

The ideal gas spring just adds a little lift and hold open force. Some gas springs can put a lot of stress on the frame.
Bart
"If you didn't build it, you will never own it."
bdring
Site Admin
 
Posts: 2966
Joined: Sun Nov 22, 2009 7:33 pm
Location: Chicago, IL, USA

Previous

Return to Build Logs

Who is online

Users browsing this forum: No registered users and 62 guests

cron